Phase Shift – What Is It?

Phase shift happens what there is more than one power feed coming into a building. Each transformer supply needs to have the same phase rotation and the identical phase location. (zero) If there is only one supply, then there is no issue. On the other...

Comms Room Installation – What Do I Require?

Why do I require both a  UPS power System Installation and an installed diesel generator system? Quite simply, the 10 seconds required to start up the generator will fall within the power failure and this short gap MUST be protected by an uninterruptible power supply...